Proyectos
WEAVING LA BORDETA
-
Location
La Bordeta, Barcelona
-
Size
2967,88 m2
-
Status
2nd position in the Public Competition
-
Sustainability
nZEB
Control of passive systems -
Flexibility
Modular proposal
About the project
Modular proposal that allows assembly and finishing in 24 weeks
A modular project with recycled material is proposed that allows the assembly of the structures in 2 weeks, plus an additional 22 weeks for the execution of installations and finishes. This proposal represents a 32% reduction in CO₂ emissions. In addition, 560m2 of urban garden and 441 m2 of vertical garden with climbing plants and soil are included.