Proyectos
WEAVING LA BORDETA
-
Location
La Bordeta, Barcelona
-
Size
2967,88 m2
-
Sustainability
nZEB
Control de sistemas pasivos -
Flexibility
Modular proposal
About the project
Modular proposal that allows assembly in 2 weeks + 22 weeks of execution of installations and finishes.
A modular project is proposed with recycled material that allows assembly in 2 weeks, adding an additional 22 weeks for the execution of installations and finishes.
This proposal represents a 32% reduction in CO2 emissions. Additionally, 560m2 of urban garden and 441 m2 of climbing and soil plants are included.