The uses of the program are optimized by adapting the most relevant spaces
Reprogram the urban spaces and the environmental functions of the territory. Re-naturalize the city by strengthening nature.
The project includes a square and a promenade, which are the connectors of the free green space between the new square on the south block of Francesc Layret Street and the Avis i les Avies square.
One of the commercial premises of Illa Creu Alta is enabled with flexibility and sustainability criteria as a sales office
Offices that take advantage of an empty industrial warehouse to host the new activity of ROA Arquitectura Hub
(ES) Una casa se reforma integralmente con el objetivo de mejorar la relación de la casa con el exterior, además de convertirla en una casa de consumo casi nulo.
A house located in the old town of l'Escala is transformed into a flexible home that can accommodate from one to three families, depending on the needs of each moment.
How to represent the historical evolution of Dubai city?
ROA architecture is commissioned to re-industrialize the twentieth century industrial park of Barcelona, nowadays abandoned, unused and that configures this big gaps of economic activity in the contemporary city.
Lighting the tradition and use of solar energy at the same time has been used to design simple but efficient solar housing refurbishment in Sabadell.
The Agora, between the city and the individual
How can we design a house that becomes a new path on the urban way?
This is a residential development based on social benefits for users and passersby, with a pattern based on the new social models of coexistence in the 21st century.
The work on the offices responds to the new functional, environmental and energy needs of the company Gynea Laboratorios.
Expansion of Gynea laboratories headquarters, a reference in women's health
Cultural activities of modernist architecture
Construction of 34 houses in Sant Just Desvern, Barcelona
Construction of 34 homes in Ronda Europa, plot 20.8 of polygon II of Can Llong in Sabadell
(ES) Residencial Illa Creu Alta es un proyecto que transforma una manzana del barrio Illa Creu Alta ubicado al norte de Sabadell.
Redisign and reconnect north Sabadell with the green area of Ripoll river
The building will be able to produce more energy than consumed
Competition for the rehabilitation of the Sallarès Deu industrial complex
Residencial Illa Creu Alta is a project that transforms a block of the Illa Creu Alta neighbourhood located north of Sabadell. In the space where an old disused textile factory was located, 131 private homes, 32 public housing, 5 commercial premises, a car park, a square and a promenade are built.
Modular proposal that allows assembly in 2 weeks + 22 weeks of execution of installations and finishes.
Adaptation to new ways of working from biophilic design and the circular economy
Romanesque heritage study
Innovative, smart and sustainable outdoor library concept
How can we counter convention with a creative, personalised and more economic proposal?
Review of Subsidiary Planning Standards
This new volumetric ordering responds to a clear desire to recognise the logic of the residential fabric of Sabadell city centre, in order to at the same time create discontinuity in the built-up mass and continuity in the public open space.
Undergrounding of the wastewater treatment plant
The assignment focuses on the preparation of a historical and constructive study of the building as well as its restitution to obtain the plans of the original state
Heritage recovery work
The design of the single-family house seeks to ensure harmony with the natural and landscape conditions that are characteristic of the inland area of the Girona region.