• Remodeling sport court

    How can we design a project based on reusing local materials?

    The work on the sports court shelter is based on reusing, redesigning and renovating an existing structure. This is a clear example of project design based on the savings obtained by a layout and building solution that is unthinkable from any other approach, which, in addition to fulfilling the commission’s purpose, is better integrated into the landscape, recovers and improves the existing material and reduces CO2 emissions, its energy consumption over its lifespan and the real execution budget.

    Location: Sabadell – Barcelona
    Size: 2.097 m²
    Status: 2008-2009 – Built
    Sustainability: Nonrenewable energy saving impact of 75,84% (37.776,39kwh in 30 years, 1.260kwh/year), of climate change in a 75,28% (14,68 TnCO2/year), waste by 86,6% (2,46m³), and 95% reuse of existing material. Save 29,25% in PEM.

  • roa arquitectura y sostenibilidad marquesina sabadell 07 ENG
  • roa arquitectura y sostenibilidad marquesina sabadell 05
  • roa arquitectura y sostenibilidad marquesina sabadell 06
  • roa arquitectura y sostenibilidad marquesina sabadell 01